Turnkey Projects
Vimal Transformer Corporation (VTC) is in business of manufacturing the Train Lighting Battery Chargers, Electroplating Rectifiers, High Voltage Testing Equipments, Rectifiers for AC Coaches & Stabilizers,& Ballast for lamps
On the other side Vimal Transformer Corporation (VTC) accepts the turnkey electrical projects.
The Vimal Transformer Corporation has been in existence from the last 16 years and has steadily grown and expanded its business both in Manufacturing and Turnkey Electrical Projects.
Both the activities of the company (Manufacturing & work contract) have already received
PROVISION 110 VOLTS BATTERY CHARGING FACALATIES AT PLATEFORM & WASHING LINES:-
During the last 20 years we completed a number of projects regarding the provision of 110 volts battery charging facilities for the charging the 110 volts coaches. We successfully completed the following Railway stations: Rewari, Lalgarh, Hanumangarh, Ludhiana, Jalandhar , Amritsar, Jammu Dehradun, Haridwar, Laksar, Nazibabad, Moradabad, Bareilly, Chandausi, Shajanpur, Kasgang,Lalkua, Bareillycity,Pilibhit,Kathgodam Hardoie,Balamau,Lucknow,Pyagh,Nannie,Nagaldem,Udhampur.Udhiana Jalandhar,Amritsar,Jammu.Railway station & washing lines.
Electrification of Railway Station
During this period we electrified more than 50 nos railway station over Northern Railway.
HT LT SUBSTATION WORKS
We have completed more than 10 nos HT substation works over Railways, state electricity Board,CONCOR etc with the supply errection of HT panels LT panels HT cables etc.
ILLUMINATION OF ROAD LIGHTING
National Highway Authority of India/Moradabad
Has awarded the turnkey project for the illumination of toll plaza’s area at Moradabad by pass project totaling Rs: 1.18 cores including the stage I & II.
The job involves supply & errection of 17 nos 25 mts High Mast system, flood lights & signal lights.
National Highway Authority of India/Gaziabad
Has awarded the turnkey project for the illumination of Toll Plaza at 29/30 Km at Gaziabad for Rs: 43.26-lacks.the works involves supply & Provision of 08 Nos High Mast System & Signal lights.
National Highway Authority of India/Gwalior
Has awarded the turnkey project for the illumination of Toll Plaza at 85 Km at Gwalior for Rs: 14.76lacks.the works involves supply & Provision of 02Nos High Mast System.
OVER MORADABAD DIVISION (N.R)FROM 1990 TO 1996
Design Supply Errection Of 110 Volt 100/200 Amps Battery Chargers At Barreilly, Haridwar, Moradabad, Dehradun, Balamau, Chandausi, Laksar, The Work Includes:-
1. Supply Of 110 Volt Battery Chargers
2. Supply Errection Of 110 V Charging Points
3. Supply And Laying Of Cables
4. Supply Errection Of Lt Panels
5. Earthings
Design Supply Errection Of Voltage Stabilizers For Pumps At Laksar & Shajanpur Over Moradabad
Repair Of 24 Volt 200 Amps Battery Chargers
More Than 50 Nos Battery Chargers Were Repaired/Rewind By Us Over Moradabad Division Of Northern Railway.
From 1997 TO 2001 OVER MORADABAD DIVISION
-
• 110 Volt Battery Charging Facilities At Haridwar For Kumbh Mela 98agreement No: 07/DEE/MB/98 Agreement Cost Rs: 7,95,000.00
-
• Provision Of 25 Mts High Mast Tower With Lt Panel At Circulating Area For Kubmh Mela 98 Agreement Cost Rs 15,25,000.00 Agreement No. 09/DEE/MB
-
• Provision Of Lighting At Circulating Area At Haridwar Agreement No:08/DEE/MB/98
-
• Electrification Of Type V 10 Nos At Moradabad Agreement No:02/DEE/MB/98
-
• Provision Of 2” F/Tube At Ujjain Express At DDN Agreement No: 05/DEE/MB/99
-
• Provision Of 2’ F/Tube At Dadar Express At Be Agreement No: 08/DEE/MB/99
-
• Provision Of 2’ Tube Light At Be In Mugalsari Express Agreement No: 09/DEE/MB/99
-
• Augmentation Of RR Building At Harawala Station Agreement No: 04/DEE/MB/99
-
• Electrification Of 348 Nos Qts At Dehradun Agreement No: 12/DEE/MB/99
-
• Provision Of Panels And Cables At Balamau Agreement No: 01/DEE/MB/99
-
• Provision Of Ductable Unit At Control Room At Moradabad Agreement No: 12/SR.DEE/MB/2000
-
• Provision Of Solar Panel Over Moradabad Division Agreement No: 10/SE.DEE/MB/2000
-
• Provision Of 11o Volt Charging Point Over MB Division Agreement No: 15/Sr.DEE/MB/2000
-
• Electrification Of 75 Hp Pump At Be Agreement No: 13/SR.DEE/MB/2000
-
• Electrification Of 398 Qts At Shajanpur Agreement NO:04/DEE/MB/99
-
• Electrification Of 398 Qts At Shajanpur Agreement NO:04/DEE/MB/99
-
• Replacement Of F/Tube Fitting In Coaches For Primary Maintenance In Train No: 4517/4518 At Dehradun Agreement No: 15/DEE/MB/2000
-
• Electrification Of P/F Shelter At Dehradun : 16/DEE/MB/2000 DT 2.02.2001
-
• Electrification Of 42 Station Over MB Division Agreement No: 06/DEE/MB/2001
-
• Electrification Of 42 Station Over MB Division Agreement No: 06/DEE/MB/2001
-
• Electrification Of P/F Shelters At Dehradun : 16/DEE/MB/2000 DT 2.02.2001
-
• Electrification Of 42 Station Over MB Division Agreement No: 06/DEE/MB/2001
-
• Replacement Of F/Tube Fitting In Coaches For Primary Maintenance In Train No: 4517/4518 At Dehradun Agreement No: 15/DEE/MB/2000
-
• Replacement Of F/Tube Fitting In Coaches For Primary Maintenance In Train No: 4517/4518 At Dehradun Agreement No: 15/DEE/MB/2000
-
• Electrification Of P/F Shelter At Dehradun : 16/DEE/MB/2000 DT 2.02.2001
-
• Repair of Battery Chargers& Power Transformer Agreement No: 15/DEE/MB dt12.2.02
-
• Remote Controlling of Pumps over MB Division 20/DEE/MB/2001 Dt 12.2.02
-
• Provision of New Substation 1x250 kvA at North Colony at Moradabad No:04/DEE/MB/2001
-
• Provision of New Substation 1x250 kvA at North Colony at Moradabad No:04/DEE/MB/2001
-
• Electrification of 65 Station over Moradabad Division Agreement No: 18/DEE/MB/2001
-
• Provision of New substation of 1x250 kvA atMoradabad Agreement No:04/DEE/MB/2001
-
• Supply errection testing & comissiong of 250 kvA DG Set at Bareilly. Agreement No:35/DEE/MB/2001
INDIAN RAILWAY CENTRAL ORGANASATION FOR TELECOM/NDLS
Supply Errection Testing Of Dc Power Supply For UHF System At HW To ROSA Section Of MB Division For FOIS Project
OVER BIKANER DIVISION
Design Supply Errection Testing Of 110 Volt Charging Facilities At Rewari Railway Station
CONTAINER CORPORATION OF INDIA LTD
Dismantling & Shifting Of 11 Kv Network At Container Depot At Moradabad.
CENTRAL RAILWAY
Supply Errection & Testing Of 16 Mts High Mast Systems At Faridabad, Mathura, Agra & Jhansi
Agreement Cost’s Rs: 18,30,000.00
Chief Electrical Engineer/Construction
Northern Railway, NDLS
Supply errection testing of Battery chargers, preecoolling points, LT panels etc at Ludhiana Railway station: under SEE/C/Jalandhar
AGREEMENT NO: 17/ELECT/C/T/6/T/JUC/ DT 8.4.97
-
• Supply & Errection & Testing of 110V. - 150 V. 200 Amp. B/Chargers.
-
• Supply & Laying of LT cable.
-
• Supply, Errection of Panel.
-
• Supply, Errection of 110V., 24V., & 440 V. precolling points.
-
• Supply errection of tabular poles.
-
• Earthing etc.
Supply, Errection Testing of B/Chargers, Precoolling Points, LT panel etc. : At Amritsar under SEE/C/Jalandhar
AGREEMENT NO: 17/ELECTRIC/C/T/4/JUC
-
• Supply & Errection & Testing of 110V. - 150 V. 200 Amps. B/Chargers.
-
• Supply & Laying of LT cable.
-
• Supply, Errection of Panel.
-
• Supply, Errection of 110V. 24V, & 440 V. precolling points.
-
• Electrification of ROH Shed.
-
• Earthing etc.
Supply Errection of Battery Charging facilities at Nagal Dem under SEE/C/CSB.
AGREEMENT NO: 124/C/CSB/
-
• Supply errection of 110V, 200 Amp. Battery Charging units.
-
• Supply & fixing of 110 V B/Charging Points.
-
• Earthing & Cable Laying.
Supply Errection of 125V-150V, 200 Amp. Battery Charging Facelities at Uhampur against Rail Link JAT-UDMP
-
• Supply Errection of 110 V, 200 Amps. B/Chargers.
-
• Supply Errection of B/Charging points.
-
• Supply, Errection of LT Panel.
-
• Earthing etc.
Supply and provision of welding facilities at Lehra Mohabat Station and thermal plant at Bathinda.
ELECTRIFICATION OF SHED WITH LT PANEL,
BATTERY CHARGERS FITTING AT JADADHRI
WORK SHOP Agreement No:17/Elect/C/T/JUC/03/UMB Dt:7.08.2003
Agreement Cost: Rs: 26,93,974.00
The work included the following:-
-
• Supply & Errection & Testing of 110V. - 150 V. 200 Amps. B/Chargers.
-
• Supply & Laying of LT cable.
-
• Supply, Errection of Panel.
-
• Supply, Errection of 110V. 80 Amps constant Current Battery Chargers.
-
• Electrification of ROH Shed.
-
• Earthing etc.
SEE/CONST
LUCKNOW
Supply errection testing & commissiong of 110-volt battery charge ring facilities at Dehradun & Haridwar Railway Station
AGREEMENT NO: 04/SEE/C/LKO/87
-
• Supply errection of 110 volt Battery chargers
-
• Supply & laying of 2x120 sq.mm LT Cables
-
• Supply & provision of Battery charging points
-
• Supply & errection of LT panels
-
• Earthing etc
Supply errection, testing and commissiong of LT under ground and overhead network at Dehradun:
AGREEMENT NO: 04/SEE/C/LKO/2000-01
-
• Supply errection of 110 volt Battery chargers
-
• Supply & laying of 2x120 sq.mm LT Cables
-
• Supply & provision of Battery charging points
-
• Supply & errection of LT panels
-
• Supply & errection of poles & oh lines
-
• Supply &fixing of preecooling points.
SR.DIVISIONAL ELECTRICAL
ENGINEER/N.E.Railway
IZATNAGAR
AGREEMENT NO: L/83/OT/02/2000-2001/BC/635
DT 18.1.2001
Improvement Of Battery Charging Facilities At Kathgodam, Pilibhit, Bareilly jn, And kasganj Stations. The Work Includes: -
Laying Of Cables
Supply Errection Of Battery Charging Points,
Supply And Commissiong Of 110 Volt/300 Amps /40 Amps Battery Chargers. Etc
NATIONAL HIGHWAY AUTHORITY OF INDIA/NEW DELHI
AGREEMENT NO: NHAI/MBD/BY PASS/2/99/TC/1214 DT 7.6.01
Supply, Errection, Testing Of 25 Mts High Mast Systems At National Highway No: 24 At Toll Plaza At Moradabad
Contract Value :Rs:35,88,998.00
Same For Stage –II nd
Contract Value: Rs:65,10,342.00
AGREEMENT NO: NHAI/MBD/BY PASS/2/99/TC/1214 DT 7.6.01
Supply, Errection, Testing Of 25 Mts High Mast Systems At National Highway No: 24 At Toll Plaza At Moradabad
Contract Value :Rs:35,88,998.00
Same For Stage –II nd
Contract Value: Rs:65,10,342.00
AGREEMENT NO: NHAI/1301/26/99/TP/PIU/1963 Dt:10.12.02
(Hapur Gaziabad by Pass Project)
Supply errection of 25 Mts High Mast 04 Nos
Supply errection of 11 Mts High Mast 04 Nos
Contract Value: RS:42,29,974.00
AGREEMENT NO: NHAI/PIU/GWL/NS-20/1/8 DT:10.03.03
(Agra Gwalior NH-3 Project)
Supply errection of 02 nos 25 Mts High Mast system
Contract Value:Rs:14,76,750.00
AGREEMENT NO: NHAI/PIU/GWL/NS-20/1/8 DT:10.03.03
(Agra Gwalior NH-3 Project)
Supply errection of 02 nos 25 Mts High Mast system
Contract Value:Rs:14,76,750.00
Agreement No:58/Award/BCED/2002-2003/407 Dt:15.3.03
Face lighting of jagwar dham at jageswar,Almora
“Supply errection of 25 Mts High Mast System at Almora.
S.NO | NAME OF WORK | AGREEMENT NUMBER & DATE | AGREEMENT COST |
---|---|---|---|
1 | Provision of 30 Mts High Mast systems at Mangalore Mandi | 575/DDC DT 4.2.02 | 8,08,000.00 |
2 | Supply & errection of 30 Mts High Mast & cabling work at Haldwani | 469/DDC Dt: 28.7.03 | 843,755.00 |
3 | Supply & errection of 02 nos 30 Mts High Mast at Sitarganj | 2574 /DDC Dt: 15.9.03 | 13,04,820.00 |
4 | Supply & errection of 02 nos 30 Mts High Mast at Haridwar | 506/DDC Dt: 31.10.2003 | 13,03,830.00 |
5 | Supply & errection of 01 nos 30 Mts High Mast at Vikasnagar | 508/DDC Dt: 31.10.2003 | 7,25,984.00 |
6 | Supply & errection of 01 nos 30 Mts High Mast at Rishikesh | 508/DDC Dt: 31.10.2003 | 7,14,451.00 |
7 | Supply & errection of 30 Mts High Mast at various mandi’s | 2912/Dt: 19.11.03 | 84,76,000.00 |
8 | Supply & errection of 15 Mts High Mast at various mandi’s | 2911/Dt: 19.11.03 | 43,05,732.00 |
S.NO | NAME OF WORK | AGREEMENT NUMBER | VALUE | AUTHORITY |
---|---|---|---|---|
1 | Provision of 25 Mts High Mast at Haridwar Railway Station | 07/DEE/MB/97 Dt: 16.2.1998 | 15,75,000.00 | Northern Railway |
2 | Provision of High Mast 25 Mts System on NH-24 [Moradabad By Pass] | MRTCL/Toll Dt:6.6.2001 | 35,88,998.00 | National highway Authority of India |
3 | Provision of High Mast 25 Mts System on NH-24 [Moradabad By Pass | MRTCL/Toll Dt: 8.02.02 | 65,10,342.00 | National highway Authority of India |
4 | Moradabad Railway Station 25 Mts | Sid/HM/01 | 6,12,000.00 | Northern Railway |
5 | Provision of 30 Mts High Mast at Mangalore[Uttranchal] | Const/CS/2001-575 Dt: 4.2.02 | 8,75,000.00 | Uttranchal Mandi |
6 | Provision of 16 Mts high Mast Jhansi,Agra,Mathura,Faridabad Railway Stations | JHS/L/169/W/T-28/2001-02 Dt:28.2.2002 | 18,68,700.00 | Central Railway |
7 | Provision of 25 Mts & 11 Mts High Mast System at NH-24 (Gaziabad-Hapur By pass) | NHAI/13011/26/99/TP/PIU/1963 Dt:10.12.2002 | 42,29,974.00 | National highway Authority of India |
8 | Provision of 25 Mtas High Mast at National Higway No:03Gwalior By pass | NHAI/PIU/GWL/NS-20/1/8Dt: 10.3.2003 | 14,76,750.00 | National highway Authority of India |
9 | Provision of 30 Mts high Mast at Anand Vihar Bus Terminal | BUS stand/BS 30.02.03 | 5,82,000.00 | Through Contractor |
10 | Face lighting of Jageswardham (Almora) | 58/BCED/2002-Dt:15.3.03 | 4,82,121.00 | CPWD Bareilly |
11 | Provision of 30 Mts High Mast at Sitarganj Mandi/Uttranchal | Const/2003/12.6.03 | 13,16,000.00 | Uttranchal Government |
12 | Provision of 30 Mts High Mast at Partapur (Merut)Without fittings | 33/Siddharta | 4,50,000.00 | Indian Oil Corporation Ltd |
13 | Supply & errection of 02 nos 30 Mts High Mast at Sitarganj | 2574 /DDC Dt: 15.9.03 | 13,04,820.00 | Uttranchal Mandi |
14 | Supply & errection of 02 nos 30 Mts High Mast at Haridwar | 506/DDC Dt:31.10.2003 | 13,03,830.00 | Uttranchal Mandi |
15 | Supply & errection of 01 nos 30 Mts High Mast at Vikasnagar | 508/DDC Dt:31.10.2003 | 7,25,984.00 | Uttranchal Mandi |
16 | Supply & errection of 01 nos 30 Mts High Mast at Rishikesh | 508/DDC Dt:31.10.2003 | 7,14,451.00 | Uttranchal Mandi |
17 | Supply & errection of 30 Mts High Mast at various mandi’s | 2912/Dt:19.11.03 | 84,76,000.00 | Uttranchal Mandi |
18 | Supply & errection of High Mast at various mandi’s | 2911/Dt:19.11.03 | 43,05,732.00 | Uttranchal Mandi |
19 | Supply errection of 16 Mts High Mast At Gwalior | 56/Sr.DEE/JHS 10.2.224 | 3,99,898.00 | NC Railway |
20 | Supply errection of 16 Mts High Mast At Gwalior | 57/Sr.DEE/JHS 10.2.224 | 3,75,898.00 | NC Railway |
21 | Supply errection of 16 Mts High Mast At RamNagar | 3406 Dt: 26.02.04 | 5,66,250.00 | Nagar Palika RamNagar |
22 | Supply errection of 16 Mts High Mast At Ruderpur | 29.02.04 | 11,92,000.00 | Nagar Palika Ruderpur |
24 | Supply errection of 16 Mts High Mast At Pithrogarh | 28.02.2004 | 12,60,000.00 | Nagar Palika Pithroagarh |
25 | Supply errection of 16 Mts High Mast At Ruderpur | 6.07.04 | 14,90,000.00 | Nagar Palika Ruderpur |
26 | Supply errection of 16 Mts High Mast At Gadarpur | 22.07.04 | 596,000.00 | Nagar Palika Gadarpur |
27 | Supply errection of 16 Mts High Mast At Ruderpur | 15.10.04 | 894,000.00 | Nagar palika Ruderpur |
28 | Supply errection of 16 Mts High Mast At Haldwani | 15.10.04 | 11,92,000.00 | Nagar Palika Haldwani |
29 | Supply errection of 16 Mts High Mast At Haldwani | 15.10.04 | 23,84,000.00 | Nagar palika Haldwani |
30 | Supply errection of 16 Mts High Mast At Ruderpur | 30.12.04 | 11,92,000.00 | Nagar Palika Ruderpur |
31 | Supply errection of 16 Mts High Mast At Jawalpur,Haridwar,Railwala Railway Station | 31.01.2005 | 26,28,9800.00 | Northern Railway |
32 | Supply erecting of 16 Mts High Mast At Ruderpur,Pilibhit,Kasganj Railway Stations | 25.02.2008 | 32,38,000.00 | North Eastern Railway Izatnagar |